HARVEST METAL FIBRES CO,, LTD
Q
How much mixing time is required when adding steel fibers to a ready mix truck?
A
Bekaert recommends continuing mixing at the highest drum speed for about 4 to 5 minutes after all steel fibers are added to the truck.

Previous:Can steel fibers can be added on site?

Next:Can steel fibers be added at the ready mix plant?