HARVEST METAL FIBRES CO,, LTD
Q
Can steel fibers be added at the ready mix plant?
A
Yes. introduce steel fibers after all other ingredients are already in the truck. Set the truck mixer on charging speed and add the fibers slowly into the mixer. Mix for about 5 minutes at charging speed.
The steel fibers can also be added to the aggregate batch belt, if there is safe access.

Previous:How much mixing time is required when adding steel fibers to a ready mix truck?

Next:What is steel fiber reinforced concrete?